Unlimited
Integration

gallery_astor_1

Site Development

Best-in-class projects in the industrial, institutional, commercial, office, multi-family, retail, and medical and healthcare sectors are designed and managed by our Site Development practice. Our experts are located throughout the state and collaborate strategically on projects to deliver the “best team for the project” for each individual client. Our landmark projects for major developers dominate the skylines of all the major cities in Texas. Whatever your project, we utilize years of experience to deliver engineering expertise from planning through construction for even the most complex projects.


Railport Business Park

RailPort Business Park is a 1,700 acre development in Midlothian, Texas providing an optimum geographical position and amenities suited to large-scale distribution and manufacturing operations.

Western Power Sports

Western Power Sports is a distributor of over 120,000 products including off-road and street motorcycles and ATV’s, as well as snowmobile and watercraft parts and accessories. The company wished to expand into additional southwest markets including Texas, Oklahoma, Louisiana, and Arkansas. For their new distribution center, the company selected a site within the Railport Business Park in Midlothian, Texas.

The James

Phase I of Street Light Residential’s development at Mid Lane and Westheimer, The James, a luxury apartment complex, is now complete. The eight-story midrise has 344 high end residential units and features a courtyard with a resort-style pool, fitness center, and a clubhouse with a resident lounge and full service bar.

Springwoods Village Fire and EMS

The joint fire and EMS station in Springwoods Village, an 1,800-acre mixed use community in north Harris County, and home to the new ExxonMobil corporate campus, will provide fire and medical emergency services to the area.

Green Bank Headquarters

Green Bank’s core values and focus on sustainability drove the design of their new headquarters into a healthier, more productive, and resource-efficient banking facility. The institution wished to develop a building that was visually, physically and operationally superior to similar banking offices and was a reflection of how they do business. This comprehensive approach has resulted in the building achieving LEED Gold, one of the first banking institutions in Houston to be awarded the certification by the US Green Building Council.

Research Forest Lakeside, Building 4

Research Forest Lakeside office complex is located on 77 heavily wooded acres overlooking Lake Woodlands. The campus is comprised of 1.8M SF of office and retail space and the Class A office buildings have been certified LEED Silver (Building 2) and LEED Gold (Buildings 4 and 5) by the US Green Building Council.

Lakeshore Phase I Infrastructure Improvements

Phase I of the Lakeshore Infrastructure Improvements included public water and wastewater facilities, private stormwater facilities, and an in-line water quality wet pond on Willow Creek.

Guadalupe Saldana

Guadalupe-Saldana Net-Zero Subdivision is the first 100% affordable housing, net-zero energy community in the State of Texas with numerous low impact development sustainable elements featured.

Cielo South Lamar

The Cielo South Lamar redevelopment project boasts 327 apartment units, 8,000 SF of retail, and 30 rental townhomes in a vertical, mixed-use complex in Austin’s downtown core.

Bridgewood Onion Creek

The 130,000 SF Bridgewood Onion Creek project provides a high quality and culturally enriching environment for 164 south Austin area seniors.

University Park

In addition to the site infrastructure improvements, JC provided site plan design, permitting, and construction services for the Sabina apartments located on the project site. Sabina features 2 urban style, 5-story buildings comprised of 570 apartment units with lush courtyards and high end amenities.

Still Waters Phase I

Two three-story apartment buildings comprise the first phase of the Still Waters project on Slaughter Lane. Phase I will consist of the development of 12.38 acres of greenfield into a multi-family development consisting of 256 one- and two-bedroom apartment units with surface parking.

Greenwater Redevelopment

Built in 1925, the Green Water Treatment Plant was Austin's first water treatment plant. The plant was decommissioned in 2008 and subsequently demolished in 2010 creating a nearly 2M+ SF plot for redevelopment in prime downtown Austin. The overall plans for the aptly renamed Greenwater Redevelopment project include up to 1.7M SF of mixed-use projects undertaken by several owner/development teams.

Sola Uptown River Oaks

Located in Houston’s high profile area of River Oaks, the five-story, multi-family project boasts 317 units that are just as fashionable as their inner Loop address.

Astor Tanglewood

Astor Tanglewood is destination living at its finest. The 6-story, multi-family development consisting of 238 apartment units is located adjacent to the Galleria area corridor near Memorial Park.

Modera Spring Town Center

Modera Spring Town Center is a 396-unit, garden-style apartment complex, consisting of 21 3-story apartment buildings with well-appointed open spaces and jogging trails.

© 2017 Jones|Carter | Phone: 713.777.5337