Water Plant No. 1 - Coles Crossing, Harris County MUD No. 365

Phase 1  -  Cost: $1,149,000.  Completion Date: 1998
Phase 2  -  Cost: $215,585.  Completion Date: November 2000
Phase 3  -  Cost: $976,027.  Completion Date: March 2002

Phase 1 included a 428,000-gallon bolted galvanized steel ground storage tank, a 15,000-gallon hydropneumatic tank, three (3) 1,000-gpm booster pumps, a 1,200-gpm well, a 350-kilowatt generator with fuel containment facilities, plant piping, controls, and electrical. Phase 2 included a 428,000-gallon bolted galvanized steel ground storage tank, a 15,000-gallon hydropneumatic tank, one (1) 1,000-gpm booster pump, plant piping, controls, and electrical. Phase 3 included an 1,100-gpm remote water well, plant piping, controls, electrical, and over 2,000 feet of a 12-inch well collection line. Our scope of services for all phases included design, contract administration, construction staking, and field project representation.

Smart Engineering. Smart Solutions.™ © 2007 Jones & Carter, Inc.