Water Plant No. 2 - Bilma Public Utility District, Harris County
Cost: $1,609,000
This project included a 497,000-gallon glass-lined ground storage tank, a 15,000-gallon hydropneumatic tank, three (3) 950-gpm booster pumps, a 1,500-gpm well, a 500-kilowatt generator with fuel containment facilities, plant piping, controls, and electrical. This project was completed within a very short time frame, on schedule and within budget. Jones & Carter, Inc. is currently designing a hydropneumatic tank addition at this site.