Jones and Carter
projects environmental/water

Water Plant No. 3 - Silverlake/Silvercreek, Brazoria County MUD Nos. 1, 2, 3, and 6

Phase 1  -  Cost: $1,190,230.25.  Completion Date: August 2000
Phase 2  -  Cost: $1,675,555.50.  Completion Date: April 2001
Phase 3  -  Cost: $535,600.00.  Completion Date: September 2002

Jones & Carter, Inc. served as the design and construction management engineer for all three (3) phases of Water Plant No. 3. Phase 1 included a 700,000-gallon composite elevated storage tank (EST) on a new site. Single-family homes were constructed near and around the EST within the next year. Because recoating typically raises concerns from residents and can be costly, the tank bowl was sprayed with a clearcoat. The clearcoat is designed to protect the color of the logos and increase the life expectancy of the coating system, thus recoating frequency and maintenance cost is reduced.

Phase 2 included a 620,000-gallon welded steel ground storage tank, a 15,000-gallon hydropneumatic tank, three (3) 1,250-gpm booster pumps, a 2,100-gpm well, plant piping, controls, and electrical. Phase 3 included a 620,000-gallon welded steel ground storage tank, a 15,000-gallon hydropneumatic tank, two (2) 1,250-gpm booster pumps, a 600-kilowatt generator with sound attenuation and fuel containment, plant piping, controls, and electrical.

Smart Engineering. Smart Solutions.™ © 2007 Jones & Carter, Inc.