Jones & Carter, Inc.'s innovative environmental solutions strike a balance between the critical need for ecological regulation and the ongoing need for community and industrial growth. Clients from both the public sector and the private arena look to Jones & Carter, Inc. to offer successful solutions to their environmental challenges.
Environmental Project Engineers from Jones & Carter, Inc. know how to deliver complex solutions by working closely with our clients to gather data, review and address current regulations and anticipate future requirements. Our engineers have gained a reputation for offering optimal solutions that are functional, efficient and effective for years to come. Some of the services we provide to our clients are listed below.
Some of the services we provide to our clients are listed below.

Permitting
Stormwater Quality
Water Pollution Abatement Plans
Risk Management plans for Water and Wastewater Treatment Plants
Wastewater Discharge Permitting
Harris County MUD No. 365
Wharton Treatment Plant No. 2
Water Plant Permitting
Floodplain Map Revisions and Flood Mitigation
Wetlands Permitting Coordination and Support
Wastewater Collection & Treatment
Sustainable design and effective implementation of wastewater facilities requires a collaborative effort. Whether you're creating, evaluating, resolving or streamlining, Jones & Carter, Inc. offers a broad base of knowledge in all areas of wastewater management. We have been master planning wastewater collection systems since 1976. In addition to gravity collection lines typical of residential developments, we design lift stations and pump stations where the topography requires.
As a result of our long-term relationships with municipal clients we not only design many treatment plants, but also are very involved in the day-to-day operation of the plants. We look for opportunities to extend engineering
fundamentals to provide innovative solutions. Whether it is gravity collection systems, lift stations, low-pressure sewer systems or treatment plants, we can design a system for your needs.
Treatment Plants
Harris County Detention Center
Harris County MUD No. 365
Treatment Plant Expansions
Harris County MUD No. 70
Fairfield Water Plant No. 1
Treatment Plant Improvements
Wharton Treatment Plant No. 2
Pump and Lift Stations
Fort Bend WCID No. 2, L.S. 6
Fort Bend WCID No. 2, L.S. 8
Montgomery County
Infrastructure Inspection and Rehabilitation recommendations
Montgomery County U.D. No. 3
Willowbrook
System Supply & Demand Analysis
Water Supply
In addition to numerous water transmission and distribution projects, we have been responsible for permitting, design, and construction administration of numerous water plant and water plant expansion projects since 1976. Many of the projects involve expansion and/or modifications of existing plants and the inherent complications involved. We are sensitive to operational needs in conjunction with the design of water distribution and production facilities. More than just concrete, steel, and engineered equipment, the design should take into account such important items as access for maintenance and long-term maintenance, power, and operational costs.
Services include:
Water Plant Engineering
Water Plant Coles Crossing
Water Production Facilities
Bilma Water Plant
Elevated Storage Tanks
Silverlake/Silvercreek Water Plant No. 3
Westador E.S.T.
Infrastructure Inspection and Rehabilitation Recommendations
System Supply & Demand Analysis
Hydraulics & Hydrology
Strength, serviceability and function are the traditional measures of success in the volatile area of stormwater design and treatment. Since Tropical Storm Allison hit the Texas Gulf Coast in 2001, Jones & Carter engineers have been at the forefront of a statewide effort to extend engineering fundamentals to provide innovative solutions to new challenges.
Rather than relying on yesterday's answers, our engineers look for opportunities to be proactive in the development of hydraulics and hydrology for today's environment. Our clients benefit from our extensive knowledge of the new Harris County TSARP requirements, along with our commitment to the proper analysis, planning, implementation, and execution of H & H projects.
- Flood Studies
- Detention Design
- Drainage Facilities
- Storm Sewer Systems
- Road Side Ditches
- Outfall Channels
- Detention Facilities
- Drainage Improvements
- Flood Mitigation Analysis
- FEMA Analysis
- Letters of Map Revision and Amendments
- Conditional Letters of Map Revision
- Stormwater Quality Features
- Stormwater Quality Management Plans
Detention Design
Longwood
Storm Sewer Systems
Present Street
Road Side Ditches
Weston Lakes
Outfall Channels
Summerwood
Detention Facilities
Summerwood
Drainage Improvements
Robinson Road
