Unlimited
Capabilities

City of Houston 108-Inch Diameter Waterline – Houston, TX

In 2016, Jones|Carter was selected by the City of Houston to design approximately 6,000 linear feet of 108-inch diameter water transmission line adjacent to the Harris County Flood Control channels located immediately south of Beltway 8 from Willis Street to Imperial Valley Drive.

TxDOT Campus Consolidation – Austin, TX

Jones|Carter was selected by The Texas Department of Transportation (TxDOT) to provide site development services for the consolidation of its Austin-area campuses into one master campus. The project is located at the intersection of Burleson Road and East Stassney Lane south of Highway 71 between Highway 183 and Interstate 35. The nearly 49-acre tract is currently undeveloped and heavily wooded.

The Canyons at Scenic Loop – San Antonio, TX

Jones|Carter is excited to partner with Southerland Communities, LLC and National Land Partners, LLC to provide services for The Canyons at Scenic Loop Development. The development is in Texas Hill Country, northwest of San Antonio, and off IH 10. The Canyons development is a private gated community comprised of single-family custom homes with lots averaging from 0.5 to 1.5 acres.

US 271 and South Loop 485 Traffic Projections and Analyses – TxDOT Tyler

Jones|Carter was selected by the TxDOT Tyler District to perform traffic projections and analyses for a high growth corridor identified for potential roadway improvements. The projections were used to assist the Tyler District in planning future improvements for 20 intersections along 10.5-miles of US 271 and South Loop 485 in Smith and Gregg Counties.

FM 1560 Corridor Traffic Study, Bexar County, TxDOT San Antonio District – San Antonio, TX

Jones|Carter has been selected by the TxDOT San Antonio District to provide engineering services for a proposed 120-foot right-of-way on FM 1560 from SH 16 to FM 471 in Bexar County. The need for an expansion to help alleviate traffic issues and congestion is evident as the roadway is currently too narrow to handle the existing traffic volumes.

Spring Cypress Congestion Mitigation and Air Quality Improvement (CMAQ) IV, Phase 1A, Harris County – Houston, TX

Jones|Carter performed engineering services for Harris County’s Traffic Signal Replacement Program. The project was funded through the federal Congestion Mitigation and Air Quality Improvement Program and was designed according to Harris County and TxDOT standards and specifications.

Springwoods Village Mobility Plan, Harris County – Houston , TX

Jones|Carter performed the mobility plan for the Springwoods Village development on northwest corner of IH 45 at SH 99 (Grand Parkway) in Harris County.

Fort Worth Speed Zone Studies, Various Counties, TxDOT Fort Worth District – Dallas/Fort Worth Area

Jones|Carter was selected by the TxDOT Fort Worth District to perform speed zone studies on more than 320 miles of roadway in Parker, Hood, Johnson, Tarrant, and Jack Counties. The work was performed as part of Work Authorization #1 under a statewide contract to perform traffic engineering studies and design for TxDOT.

Traffic Signal Designs – TxDOT Amarillo District

Jones|Carter is performing traffic signal design services in eight counties for the TxDOT Amarillo District. The work is part of Work Authorization #5 under a statewide contract to perform Traffic Engineering Studies and Design for TxDOT.

State Highway 6 – Erath County, TX – Dallas/Fort Worth Area

Jones|Carter is working alongside the TxDOT Fort Worth District to upgrade 16 miles of SH 6 in Erath County into a Texas Super 2 highway. The population of Erath County has grown by more than 10% since 2010 creating a rise in the rural traffic volumes. With the growing population in these rural areas, more pressure is put on two-lane highways like State Highway 6. Tractor-trailers and other heavy truck traffic also use SH 6 as a bypass around the congested Dallas and Fort Worth area freeways.

© 2019 Jones|Carter | Phone: 713.777.5337