I truly was very impressed with Jones|Carter and their crews and everyone at the offices, they truly did a fantastic, outstanding job."
Wayne Cockrell, Carter Ranch Manager |
Client Testimonial
Carter Ranch
CLIENT Mattie Carter Trust
LOCATION Leon and Freestone Counties, TX
PROJECT STATS
PROJECT DURATION
30-Days
Location
Leon and Freestone Counties, TX
SERVICES
Surveying
14,699 Acres
Across 2 Counties
16.2 Miles
of Waterline
50
Adjoining Properties
PROJECT OVERVIEW
Jones|Carter provided surveying services for Carter Ranch, a 14,669-acre working cattle ranch located in both Leon and Freestone Counties along the Trinity River. Large portions of the ranch had not been surveyed since the late 1800s when the land was cut from the sovereign of Texas. The J|C team surveyed 29 separate tracts, including 2.2 miles of railroad right-of-way, 16.2 miles of river, and approximately 50 adjoining properties within the allotted 30-day timeline.
The J|C survey team performed a modified land title survey and a boundary survey that encompassed the location of all visible improvements to the ranch, including fencing, pipeline, overhead electric, cattle work and facilities, and housing.
In order to meet the constrained schedule, the J|C team developed a new way to use proven technology, which sped up the surveying process without sacrificing accuracy. Aerial photogrammetry was utilized in combination with conventional survey methods to produce an accurate depiction of the 16.2 miles of waterline. The J|C survey team deployed dedicated field crews from multiple office locations to work jointly with the drones to collect the necessary waterline GPS data for quality assurance. The area around the Trinity River is heavily wooded, utilizing drones to aid with the surveying resulted in time savings and enhanced safety for J|C team members.
The Carter Ranch project presented numerous challenges for the J|C survey team. However, with collaboration, dedicated workers, and the inventive use of available technologies, the project was completed on schedule.
AWARDS
2018 Jones|Carter Project of the Year